Do I need my own block of land?

We can work with you if you have already purchased your land.  We do have spec homes under construction therefore it may be convenient to take a look at what is currently under construction and for sale if you have not yet obtained land.

How do I obtain my house plans?

We can work with you to develop your dream home.  We have a very experienced and reliable draftsman who we highly recommend to design your home to suit your land shape/size, and your desired requirements.

Can I make changes during construction?

Some changes can be made depending on what they are and what stage the construction has reached.  Some changes will require an agreed variation document in place and may incur additional fees.

Can I visit the construction site?

Yes, however, an appointment is essential to ensure supervision and safety.

Who should I contact during the construction period?

Either the builder direct, Glenn Warriner or Tanya Warriner if your query is related to colour choices, fixtures and fittings.

Who choses the fixtures, fittings and colours?

Tanya Warriner is currently studying Interior design with The Design Institute of Australia and has been responsible for all colour selection, floor coverings, fixtures and fittings for the past 10 years.  However, If you have a theme or colour scheme desire we are more than happy to work in with your choices.

How long will the construction process take?

Approximately 12 weeks however this can be weather dependant.

How are stage payments made?

As per the Queensland Building & Construction Commission (QBCC) Contract Payment Schedule:

Payment TypeDue DateAmount %
DepositUpon Contract signing5%
BaseOnce slab has been poured10%
Frame StageOnce frame has been erected15%
Lock-up StageOnce the construction can be locked up and secured35%
Fix OutOnce internal fixings (doors, architraves etc) have been completed20%
CompletionUpon handover15%
Are there any additional charges once a Building Contract is signed?

No, only if there is a variation to the building and a variation agreement has been signed.

What is a variation?

A variation is a change to the initial contract and original house design.

What is your warranty period?

As per the QBCC requirements we offer a 12 month maintenance period from the time of handover and a 6.5 year structural warranty period.